Monday, June 23, 2008

Building the World Trade Center (1983) Documentary

This is a documentary about how was the World Trade Center was built. Critical Path Method (CPM) was utilize as the scheduling tool to ensure smooth progress on deliveries of materials (steel sections) that should arrive at the exact order and to the exact time needed. "CPM would coordinate every aspect of construction, track the flow of materials and minimize any delays."






source: Google Video

No comments:

Disclaimer

Civil Engineer's World claims no credit for any images/videos featured on this site unless otherwise noted. All visual content is a Copyright to it’s respectful owners(links). Civil Engineer's World is in no way responsible for or has control of the content of any external web links. Information on this site may contain errors or inaccuracies and Civil Engineer's World does not make warranty as to the correctness or reliability of the webs' content. If you own rights to any of the images and contents, and do not wish them to appear on this site, please contact Civil Engineer World by and they will be promptly removed.

On posts about Financial Literacy:
Any forward looking statements, market predictions, analysis written on this site should be treated with caution. The market may move in the direction different from any person's opinion. In no occasion that I am responsible to your loss based on the details you have read on this website. Investment requires due diligence, study and experience before gains can be achieved and the readers are responsible for the trades they are executing. Contents of the page may be changed without prior notice.