Thursday, August 14, 2008

A Formwork Formula: Tips For Success

Formwork—the temporary or permanent molds used to hold wet concrete until it cures—is a crucial element in concrete construction. Just as important is selecting the right type of formwork since that greatly affects the schedule, labor requirements, quality and total cost of a project.

Over the years, formwork molds have evolved from traditional job-built timber to pre-engineered systems composed of a combination of steel, aluminum, manufactured timber, plywood and plastics. These advancements in formwork molds have led to increased jobsite production and safety, with less labor, while producing a better finished product.

Formwork trends
Fewer than 15 years ago, approximately a dozen major formwork systems were readily available in the United States. However, over that short time period, several European forming companies have entered the domestic market, more than doubling the number of systems available.

The increase in competition is pushing innovations to a rate previously unseen in the industry. Thirty-year-old systems that have enjoyed wide use and popularity are being supplanted by new, modern systems that offer greater productivity and a higher quality results.

Walls—Presently, the most prevalent system in use for handset wall forming are steel-framed, wood-faced panels that require consumable ties at 2-feet-on-center and one connection per square foot. These are being replaced with larger, two-person handset systems that require less labor and eliminate consumable purchases because of reusable taper ties.

Gang forming has completely changed over the past 10 years. Older systems of steel-framed wood or steel-faced panels with double channel stiffbacks that connect with bolts/pins have been overtaken by clamp connection forms with wood or plastic form faces that provide tremendous labor savings in assembly and use. Assembly and reconfiguration of these standard systems to meet changing structure dimension happens very quickly, and also provides a consistent concrete finish.

Slabs—The use of fixed or adjustable wood posts, stringers and joists is still the most common method of shoring of slabs in the United States. This method ― passed down from generation to generation ― requires substantial labor. Because the posts are placed as close as 2-feet-on-center, construction sites become very congested.

A new construction method featuring engineered lumber and metal posts increases post spacing up to 5 feet by 10 feet and offers components that are systematic and reusable. This increased spacing allows for less material on site to form the same slab area. Less material means reduced handling requirements, less labor to set up and strip the formwork, lower transport costs, and an increase in overall job site productivity.

The current method for gang-forming slabs uses trusses or structural decks, which require a substantial amount of time for assembly and disassembly. Moreover, this method consumes an enormous amount of crane time, thus increasing the time for resetting a standard operating procedure. The customer must also purchase the plywood facing and sometimes replace it multiple times on the same project.

Because of the expense of setup and takedown, gang-forming slabs are used mostly on structures taller than 15 stories high. Smaller tables ― delivered to the job site fully assembled with plywood ― are becoming a better solution to these systems, especially for mid-rise buildings where gang-forming was previously not economical.

Another innovation that reduces job site crane time and formwork labor requirements is formwork-lifting elevators that mount to the exterior of a building, allowing all formwork to be cycled from floor to floor without the need for a crane. These table-lifting systems are used in conjunction with the smaller table method and also allow for other construction material including handset shoring, vertical formwork and reshores from below to cycle from floor to floor with a crane.

Read more (here)...

Source: http://www.gostructural.com/article.asp?id=2988

4 comments:

Abas KS said...

Finally, a civil engineering post. Thank goodness. :) Go easy on the church pills, dude.

leonardo said...

a.i. editor:

thanks for considering posts about civil engineering... and for the posts about the church and catholicism, it's a responsibility - it's my foundation of who i am now.

Gene said...

I'll give an engineered Amen to that.

leonardo said...

An engineered Thank You, Gene. ;)

Disclaimer

Civil Engineer's World claims no credit for any images/videos featured on this site unless otherwise noted. All visual content is a Copyright to it’s respectful owners(links). Civil Engineer's World is in no way responsible for or has control of the content of any external web links. Information on this site may contain errors or inaccuracies and Civil Engineer's World does not make warranty as to the correctness or reliability of the webs' content. If you own rights to any of the images and contents, and do not wish them to appear on this site, please contact Civil Engineer World by and they will be promptly removed.

On posts about Financial Literacy:
Any forward looking statements, market predictions, analysis written on this site should be treated with caution. The market may move in the direction different from any person's opinion. In no occasion that I am responsible to your loss based on the details you have read on this website. Investment requires due diligence, study and experience before gains can be achieved and the readers are responsible for the trades they are executing. Contents of the page may be changed without prior notice.